Jul 19, 2012

CCNA 3 Chapter 5 V4.0 Answers Updated 2012

1.What is the first step in the process of convergence in a spanning tree topology? election of the root bridge blocking of the non-designated ports selection of the designated trunk port determination of the designated port for each segment 2.Refer to the exhibit. The spanning-tree port priority of each interface is at the default...

Read more »

CCNA 3 Chapter 4 V4.0 Answers Updated 2012

1.Which statement is true when VTP is configured on a switched network that incorporates VLANs? VTP is only compatible with the 802.1Q standard. VTP adds to the complexity of managing a switched network. VTP allows a switch to be configured to belong to more than one VTP domain. VTP dynamically communicates VLAN changes to all switches...

Read more »

CCNA 3 Chapter 3 V4.0 Answers Updated 2012

1.Refer to the exhibit.  SW1 and SW2 are new switches being installed in the topology shown in the exhibit. Interface Fa0/1 on switch SW1 has been configured with trunk mode “on”. Which statement is true about forming a trunk link between the switches SW1 and SW2? Interface Fa0/2 on switch SW2 will negotiate to become a trunk link...

Read more »

CCNA 3 Chapter 2 V4.0 Answers Updated 2012

1.When a switch receives a frame and the source MAC address is not found in the switching table, what action will be taken by the switch to process the incoming frame? The switch will request that the sending node resend the frame. The switch will issue an ARP request to confirm that the source exists. The switch will map the source MAC...

Read more »

Jul 18, 2012

CCNA 2 Chapter 11 V4.0 Answers Updated 2012

1.Refer to the exhibit. What does the "2" stand for in the router ospf 2 statement? The number 2 is the autonomous system number. The number 2 indicates the number of networks advertised by OSPF. The number 2 identifies this particular instance of OSPF on this router. The number 2 indicates the priority of the OSPF process on this router. ...

Read more »